Serving Rochester, Monroe County & Greater Rochester Mon–Fri 6:30am–5pm · Sat 7am–1pm Same-day & next-day delivery
Demolition debris removal in Rochester: a 30 yard container beside a half-demolished detached garage on a narrow city lot, framing and old roofing loaded flat while the mercury thermostat and pipe wrap are set aside.

Demolition

Demolition Debris Removal in Rochester

Garages, porches, interior gut jobs and whole structures across Rochester and Monroe County. Two things always get checked before anything comes down here: the asbestos presumption under Industrial Code Rule 56, and the old thermostat on the wall.

Licensed & InsuredFull commercial coverage on every load we haul
Same-Day DeliveryCall before noon and we can usually make it today
Flat-Rate PricingOne number covering delivery, pickup and disposal
Locally OwnedRochester based since 2011 — not a call center

Demolition in Rochester begins with a date. Under 12 NYCRR § 56-5.1, New York’s Industrial Code Rule 56, the requirement for an asbestos survey before demolition, renovation, remodelling or repair falls away only for structures whose original construction commenced after 1 January 1974. More than half of this city’s housing was built before 1940, so on most Rochester jobs that exemption simply does not apply. And the exemption that people do reach for is narrower than they think: it covers an owner of a one or two-family dwelling who contracts for but does not direct or control the work. It is not a rule that houses are exempt from New York asbestos requirements. Read it once, properly, before you plan a demolition sequence, and take the guidance from the New York State Department of Labor rather than from a contractor forum.

Then read the sentence that follows from it, because it reverses what most people assume an exemption means. The Department states: “Buildings qualifying for exemptions must still be assumed to contain asbestos and demolished as an asbestos project unless there is a survey that appropriately documents that there is no asbestos.” An exemption from the survey is not an exemption from the rules. It is a presumption that asbestos is present, and demolishing a building as an asbestos project costs a great deal more than surveying it first. On a pre-1974 Rochester structure, where nine by nine vinyl asbestos floor tile and asbestos pipe insulation are routine finds in basements every week of the year, the survey is almost always the cheaper path. We do not accept asbestos in our containers under any circumstances; it moves under a separate NYSDEC Part 364 permit and a licensed abatement contractor.

The second thing to check is on the wall, and it is a duty that names demolition contractors specifically. New York has banned the disposal of mercury thermostats since 2005, under Environmental Conservation Law Article 27, Title 29. What makes it relevant here rather than merely interesting is that the Department of Environmental Conservation states that contractors replacing mercury thermostats or demolishing buildings are required to bring mercury thermostats to collection programs. That is not a general environmental aspiration, it is a demolition-specific obligation. If you are taking down a pre-1990s Rochester house or gutting one, the old round thermostat in the hallway comes off the wall and goes to a collection point, not into the container. Manufacturers fund that collection at no cost. It takes two minutes and it is a genuine legal requirement rather than best practice. See NYSDEC for collection sites.

Where the debris goes is decided by the City. City Code § 20-15F: “Contractors performing work must make arrangements for the proper and legal collection and disposal of waste generated during the construction process and such waste shall not be collected by the City.” Demolition debris is the clearest possible case of that. Meanwhile Mill Seat Landfill in the Town of Riga is commercial accounts only, no residential customers, Monday to Friday from 7:00 am to 3:30 pm, so a homeowner taking down a garage cannot simply drive the material out to the county facility. That gap between what the City will not collect and what the landfill will not accept from you directly is the entire reason roll-off service exists in this market, and it is worth understanding before you swing the first sledge rather than after. Our construction debris article sets out the sequence.

Beyond asbestos and thermostats, demolition on old Rochester stock throws up the usual list. Lead paint is effectively a given: roughly nine houses in ten here predate 1980, and the federal renovation, repair and painting rule at 40 CFR Part 745 covers demolition in pre-1978 housing always, regardless of square footage. Knob-and-tube wiring, cast-iron drain lines and galvanised supply are all normal finds and all worth separating for scrap. Fluorescent tubes, ballasts, refrigerant-bearing equipment, fuel oil tanks and propane cylinders come out before the structure does. And if there is anything that breaks ground — a slab, a footing, a foundation — call in a locate to UDig NY first: at least two but not more than 10 working days’ notice under 16 NYCRR § 753-3.1. It is UDig NY in New York, renamed from Dig Safely New York in September 2021.

Demolition Jobs We Supply Containers For

Detached Garage Removal

The most common demolition job in this city. Framing, old roofing, siding and a concrete slab, which is dense and belongs in its own container loaded flat rather than on top of the timber.

Porch And Rear Stair Removal

Rochester porches rot from the treads down. Framing, decking, balusters, roofing and often a set of concrete or stone steps that want loading flat on the floor.

Interior Gut Jobs

Plaster and lath, trim, flooring, cabinetry, old sash and lath nails by the bucket. Heavy material that needs a smaller container run alongside the main one.

Chimney Removal

Brick, mortar, flue tile and the flashing that comes with it. Pure masonry, dense, and a 10 yard job loaded flat even when the pile looks modest.

Outbuildings And Sheds

Sheds, workshops, small barns on outer-county properties, and whatever has been stored in them for thirty years. Mixed material and often more volume than expected.

Kitchen And Bath Strip-Outs

Cabinets, counters, tile in a mortar bed, a cast-iron tub and the plaster behind it. The tub and the copper come out for scrap first.

Foundation And Slab Breakout

Concrete, block, stone and rubble foundation spoil. The heaviest material we handle and always a small container, loaded flat and stopped at the fill line.

What Never Goes In

Asbestos, in any form. Mercury thermostats, which have a demolition-specific collection duty. Fluorescent tubes and ballasts, refrigerant equipment, fuel tanks, propane cylinders and electronics.

Sizing A Demolition Container

Demolition produces two kinds of debris and they want two kinds of container. Dense material — concrete, brick, block, mortar, stone, plaster and lath, tile in a mortar bed, foundation spoil — goes in a 10 or a 15, loaded flat and spread across the floor, and it will reach a legal payload while the sides are still visible. Bulky material — framing, sheathing, roofing, siding, cabinetry, trim, insulation — goes in a 30, which is the standing container on most demolition jobs here. A 40 is for airy work only, such as a commercial gut job producing partitions, ceiling grid and systems furniture, and it should never see masonry or soil. On a garage teardown the honest answer is usually a 30 for the structure and a 10 for the slab. That costs less than one container that reaches payload half full and then cannot lawfully leave the site. Dimensions are on the container sizes page.

Sequence, Access And Permits

Get the sequence right and the container work is straightforward. Survey or presumption first, under 12 NYCRR Part 56. Then the strip-out: thermostat off the wall for collection, fluorescent tubes and ballasts out, refrigerant equipment and fuel tanks out, electronics out, scrap metal separated. Then the structure. Then the slab, in its own container. On access we need roughly 60 feet of straight approach, about ten and a half feet of width and 20 feet or more of overhead, and on a narrow Rochester lot with a garage at the back of a long drive the overhead is usually the constraint, because the service drop crosses the drive from the pole. Plywood under every wheel, always, and particularly in March and April when the silt loams under this county are at their wettest. If the container has to go in the right-of-way, that is a permit in writing from the City Engineer under City Code § 104-24, barricaded and lit at night under § 104-24(C). Contact the Department of Environmental Services for current fees. Placement holds five feet clear of combustible walls, openings and roof eave lines under 19 NYCRR Part 1225.

Not sure this is the right service? Describe the job on the phone and we will point you at the right container even if it is a different service page. Call (585) 514-5622.

How it works

Demolition Debris Removal in four steps

  1. 1

    Call us

    Tell us the project, your address and when you want it. Two minutes on the phone and you have a flat price.

  2. 2

    We deliver

    Our driver walks the drop, lays protection boards and sets the container exactly where you want it.

  3. 3

    You load it

    Take your time within your rental window. Keep it level with the top rail and we handle the rest.

  4. 4

    We haul it

    Call or text when you are done. We pull it, sort what can be recovered and dispose of the rest properly.

Demolition Debris Removal FAQs

Do I need an asbestos survey before demolishing a garage?

Ask the question properly rather than assuming. Under 12 NYCRR § 56-5.1 the survey requirement is waived for structures whose original construction commenced after 1 January 1974, and there is a narrow carve-out for an owner of a one or two-family dwelling who contracts for but does not direct or control the work. Neither of those amounts to houses being exempt. And the Department of Labor is explicit that buildings qualifying for exemptions must still be assumed to contain asbestos and demolished as an asbestos project unless a survey documents otherwise. On pre-1974 Rochester stock the survey is usually the cheaper route. We do not accept asbestos in our containers at any time.

What is the thermostat rule?

New York has banned mercury thermostats from disposal since 2005 under ECL Article 27, Title 29, and the Department of Environmental Conservation states that contractors replacing mercury thermostats or demolishing buildings are required to bring them to collection programs. Demolition is named specifically. If you are gutting or taking down a pre-1990s Rochester building, the old round thermostat comes off the wall and goes to a collection point. Manufacturers fund the collection at no cost through a statewide program. It is a two-minute task and it is a legal duty rather than a courtesy, so it is worth putting on the strip-out checklist alongside the fluorescent tubes.

Can I put the concrete slab in with the garage timber?

You can, and it will cost you. Concrete, block and stone are several times denser than framing and roofing, so a container carrying both reaches a legal payload while it still looks half empty, and at that point it cannot lawfully leave your property. The right answer on a garage job is two containers: a 30 for the structure and a 10 for the slab, loaded flat and spread across the floor. If the slab is small, tell us the rough dimensions and we will advise whether it can ride along. Broken concrete also needs to go in pieces two people can place rather than pieces one person can drop.

Does the City take demolition debris?

No, and it says so directly. City Code § 20-15F states that contractors performing work must make arrangements for the proper and legal collection and disposal of waste generated during the construction process and that such waste shall not be collected by the City. The county landfill is not an answer for a homeowner either, since Mill Seat in the Town of Riga is commercial accounts only, no residential customers, open Monday to Friday from 7:00 am to 3:30 pm. Between those two rules there is nowhere for demolition debris to go except a private hauler, which is exactly what this service is. Current City rules are at cityofrochester.gov.

What about lead paint on a demolition?

Assume it is there. Roughly nine houses in ten in this city predate 1980 and more than half predate 1940, and the federal renovation, repair and painting rule at 40 CFR Part 745 covers demolition in pre-1978 housing always, regardless of square footage. That means lead-safe work practices, containment and clean-up are part of the job rather than an optional extra. On rental property there is a further layer: the City has had its own lead ordinance under Chapter 90, Article III since 2005, and New York’s Lead Rental Registry names Rochester as one of 25 communities of concern. Our lead-safe debris guide covers containment and loading.

Where we deliver

Demolition Debris Removal across Monroe County and Greater Rochester

Same service, same flat rates, every town below. Pick yours for local placement and permit notes.

Talk to a real person

Need demolition debris removal in Rochester?

Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.

Serving Rochester, Monroe County and Greater Rochester · Mon–Fri 6:30am–5pm, Sat 7am–1pm

(585) 514-5622 Free quote · no obligation
Call (585) 514-5622Free quote · same-day delivery