
One room, or one unit
15 Yard Dumpster Rental in Rochester, NY
The size for a job with a boundary around it. A kitchen, a bath or a bedroom stripped to the studs. A garage cleared. A small tear-off. One unit of a two-family turned over between tenants. It has enough volume to take a room’s worth of mixed material without turning into a container you have to ration, and it is still short enough to sit on a narrow Rochester driveway. Where it stops is the moment plaster, tile or wet basement contents make up most of the load rather than part of it.
A 15 yard roll-off is around sixteen feet long, eight feet wide and about four feet tall — roughly four to six pickup loads. It is the middle of the small end: more room than a 10 without the twenty-two foot footprint of a 20, which matters a great deal on the narrow driveways that come with Rochester’s tight residential lots. Think of it as one room done properly, or one clearly bounded job, rather than a container you keep going back to for the whole house.
- Capacity15 cubic yards
- Footprint16 ft x 8 ft x 4 ft
- Weight allowance2 – 3 tons
- Holds about~4 – 5 pickup truck loads
Why people choose the 15 yard
The 15 exists for jobs with an edge around them. A kitchen out to the studs, a bathroom rip-out, a bedroom stripped, a garage emptied, a small roof, a hedge line removed, one unit of a two-family cleared between tenants. What those have in common is that you can see the end of them from the start, which is exactly what makes a mid-size container sensible: you are not rationing space and you are not paying to move air. In this city the up-and-down two-family is a staple of the housing stock, and turning one flat over is the single most common bounded job we supply. Carpet, cabinets, a vanity, blinds, curtains and whatever the last tenant left behind will fill a 15 and stop there. If the job keeps expanding as you look at it — and basements here do — the honest answer is the next size up rather than a second 15. Tell us at the booking whether the job has a hard edge or an open one, because that one answer moves the recommendation further than the room count ever does.
Material still governs, and in Rochester the material tends to be older and denser than people expect. More than half of the housing here predates 1940, so a kitchen strip-out often means plaster and lath rather than board, tile bedded in mortar rather than thinset, a cast-iron tub, and cabinetry built in place from solid timber. The metal comes out first, because a cast-iron tub, copper supply lines and galvanised pipe all have scrap value and none of them need to be paid for twice. Corrugated cardboard is worth flattening and separating too, especially if new units are being delivered in boxes. New York’s recycling framework runs through municipal source separation law rather than a statewide ban list: General Municipal Law § 120-aa required every municipality to adopt one by 1 September 1992, and Rochester complied with City Code Chapter 20, Article IV in November 1991. After those separations, the rest of the room can go in commingled: cabinetry, trim, flooring, insulation, doors and the packaging the new units arrived in.
The third thing the 15 does well is act as the heavy container on a two-container job. On a whole-flat gut in a Rochester two-family, the volume argument says one big container and the weight argument says one small one, and both are right about different material. Running a 30 for the cabinetry, framing and general debris alongside a 15 for the plaster, tile and masonry means each container goes out at the right weight, neither is carrying the other’s problem, and you are not paying to move a half-empty container that has already reached payload. Load by material rather than by whichever pile is nearest the door. It takes a little more discipline on site and it is consistently cheaper than the alternative. In practice that means two piles rather than one heap by the back step, and it is the habit that separates a job which finishes on schedule from one that stalls waiting on a container nobody can legally lift. It is also the arrangement most of our regular contractor accounts have settled into.
Roofing is the other place the 15 earns its keep, and roofing sizing is arithmetic rather than judgement. A roof is measured in squares of a hundred square feet, a single layer of three-tab runs in the region of two hundred and fifty pounds a square, and architectural shingle is heavier again. A second layer roughly doubles the weight without doubling the volume, which is why tear-off containers reach payload with the sides half empty. A 15 handles a mid-range Rochester house at a single layer, or a smaller roof carrying two. What changes the answer here is ice damage: this county takes 102 inches of snow a year, meltwater refreezes at the cold eave and backs up under the shingle courses, and after a few winters the decking at the bottom of the roof plane is soft. If plywood is coming off with the shingle, that is volume rather than weight and it may push you to a 20. Count the squares, count the layers, and say whether decking is coming off.
Good fit for
- A kitchen or bathroom stripped to the studs
- One bedroom or living room gutted
- A garage or basement storage bay cleared
- One unit of a two-family turned over
- A small to mid-size roof tear-off
- Hedge, shrub and fence line removal
- The heavy container on a two-container job
- Mixed masonry with timber through it
Not the right size for
- A full basement and attic in one weekend
- A whole two-family emptied top to bottom
- Pure concrete, stone or brick rubble
- Wet basement contents in quantity
- Whole-house furniture clearances
- Commercial fit-outs and shop fittings
Will it fit?
At around sixteen feet the 15 is still an easy container to place, and in Rochester that is worth real money. It goes onto a single-width driveway where a twenty-two foot container will not swing, and it sits low enough that material can be lifted in over the side rather than carried round to the door. The truck still needs about 60 feet of straight approach, roughly ten and a half feet of width, and 20 feet or more of overhead clearance for the hoist to stand the container up as it comes off the rails. Overhead is what stops sets here: the street canopy is mature across Park Avenue, the South Wedge, Browncroft, Corn Hill and the older parts of Brighton and Irondequoit, and the electrical service drop runs beneath it from the pole to the house. Look up before you book, or send a photograph from the curb. Plywood goes under the wheels on every delivery and we photograph the approach on arrival, because most driveways in this county are older asphalt or concrete with freeze-thaw cracking already in them. On placement, 19 NYCRR Part 1225 carries the International Fire Code rule keeping a container over the size threshold out of buildings and at least five feet from combustible walls, openings and combustible roof eave lines; the threshold tightened in the 2025 code cycle, so confirm it locally. If it has to go in the street, that is a written right-of-way permit from the City Engineer under § 104-24, and § 104-24(C) requires it to be barricaded and lit at night.
Before delivery, move cars and bins, mark irrigation heads and septic lids, and tell us about new concrete, soft ground, a steep grade or low power lines. Our delivery and driveway protection guide covers all of it.
Compare all four sizes
| Size | Footprint | Weight allowance | Holds about | Best for |
|---|---|---|---|---|
| 10 Yard Dumpster | 12 ft x 8 ft x 3.5 ft | 2 – 3 tons | ~3 pickup truck loads | Concrete, brick, plaster and lath and rubble foundation spoil — weight fills it long before volume does. |
| 15 Yard Dumpster | 16 ft x 8 ft x 4 ft | 2 – 3 tons | ~4 – 5 pickup truck loads | A single room, a small tear-off, or one unit of a two-family turnover. |
| 20 Yard Dumpster | 22 ft x 8 ft x 4.5 ft | 3 – 4 tons | ~6 – 8 pickup truck loads | A full basement and attic clear-out — the Rochester default — or a multi-room remodel. |
| 30 Yard Dumpster | 22 ft x 8 ft x 6 ft | 4 – 5 tons | ~9 – 12 pickup truck loads | A whole two-family turnover with basement and attic, or a large remodel. |
| 40 Yard Dumpster | 22 ft x 8 ft x 8 ft | 5 – 6 tons | ~12 – 16 pickup truck loads | Whole-house cleanouts, commercial gut jobs and redevelopment debris. |
Still not sure? Describe what you are throwing away and we will size it on the phone in two minutes. Getting it wrong costs us more than it costs you, so we have every reason to get it right. Call (585) 514-5622.
Book a 15 yard
Flat rate including delivery, pickup, rental period and disposal. Same-day where we can.
(585) 514-5622Other sizes
Popular services
All sizes
Compare our four roll-off containers
10 Yard Dumpster
Concrete, brick, plaster and lath and rubble foundation spoil — weight fills it long before volume does.
View this size → 15yd³15 Yard Dumpster
A single room, a small tear-off, or one unit of a two-family turnover.
View this size → 20yd³20 Yard Dumpster
A full basement and attic clear-out — the Rochester default — or a multi-room remodel.
View this size → 30yd³30 Yard Dumpster
A whole two-family turnover with basement and attic, or a large remodel.
View this size → 40yd³40 Yard Dumpster
Whole-house cleanouts, commercial gut jobs and redevelopment debris.
View this size →15 Yard Dumpster FAQs
Is a 15 big enough for a kitchen?
For most Rochester kitchens, yes, provided the plaster is not the majority of the load. Cabinets, counters, appliances, flooring and trim from a single kitchen fit comfortably. What changes the answer is what is behind the cabinets: in a pre-1940 house that is keyed plaster on wood lath, which is dense and heavy, and if the whole room is coming back to the studs the plaster alone can dominate the weight. The cast-iron tub and the copper come out for scrap either way. If the walls are coming out too, ask us about running a 10 for the plaster alongside the 15.
Is it right for one side of a two-family?
It is the size we recommend most often for exactly that job. Rochester is a renter-majority city — only about 38 per cent of housing units inside the city line are owner-occupied — and turning over one unit of an up-and-down double is the routine work of this market. Carpet, cabinets, a vanity, blinds, mattresses and abandoned furniture will fill a 15 without waste. Where it changes is if the turnover includes a strip-out or a share of the basement. Then it is a 20, or a 15 with a swap. Our two-family turnover guide works through the sequence.
Can I use it for a roof tear-off?
For a small to mid-size roof, yes. Roofing is sized by squares and layers rather than by rooms: a single layer of three-tab runs roughly two hundred and fifty pounds a square and architectural shingle is heavier, so a second layer roughly doubles the weight without doubling the volume. A 15 handles a mid-range Rochester roof at one layer, or a smaller roof carrying two. Flashing, drip edge, valley metal and any gutter coming down are scrap metal and are worth pulling out of the load. If ice-dam damage means decking is coming off as well, that is volume rather than weight, and it may push you up a size.
What is the difference between a 15 and a 20 in practice?
Footprint, mostly. A 15 is around sixteen feet long and a 20 is around twenty-two, and on a narrow Rochester driveway with a porch on one side those six feet decide whether the container goes in at all. In volume terms the step up is real but not dramatic; in placement terms it can be the whole question. Our rule of thumb is that a bounded single-room job takes a 15, and anything measured in floors, whole basements or whole buildings takes a 20. If you are genuinely between the two and the drive is tight, take the 15 and plan a swap rather than finding out the 20 cannot be set.
How long can I keep it?
As long as the job needs. Most one-room jobs run a week to a fortnight and there is no reason to rush a container off your own driveway. Ring the yard on (585) 514-5622 when you want it collected and we will fit it into the route. Keep it tarped if wet weather is due, because plaster, carpet and cardboard gain weight fast in the rain, and in this county snow does the same thing on roughly every other day in January. If the container is in the street under a right-of-way permit, the City Engineer sets the timeframe, so a street set is worth finishing promptly.
Services
What people put in a 15 yard
Residential Dumpster Rental
Driveway placement for the full-basement, attic and porch cleanouts a pre-1940 house produces.
Learn more →Commercial Dumpster Rental
Containers for businesses and contractors — City Code §20-15F puts construction waste on you, not the City.
Learn more →Construction Dumpster Rental
Mixed C&D in one roll-off, with next-day swap-outs across Monroe County.
Learn more →Roofing Dumpster Rental
Weight-rated cans sized by squares and layers, set five feet off the eave line.
Learn more →Roll-Off Dumpster Rental
10, 15, 20, 30 and 40 yard roll-offs across Rochester and Monroe County.
Learn more →Same-Day Dumpster Rental
Call before the cut-off and we can usually get a container to you this afternoon.
Learn more →Talk to a real person
Need a 15 yard in Rochester?
Tell us what you are clearing out and we will tell you the right size and the flat price to put it in your driveway. No forms, no waiting on an email — just call and we will sort it out in a couple of minutes.
Serving Rochester, Monroe County and Greater Rochester · Mon–Fri 6:30am–5pm, Sat 7am–1pm